HOMEOWNER
ASSISTANCE
PROGRAM
TEXAS GENERAL LAND OFFICE HAP ELIGIBLE COUNTIES
QUESTIONS?
http://recovery.texas.gov/
1-844-893-8937 cdr@recovery.texas.gov
inside rightinside le
ABOUT THE PROGRAM
HOW IT WORKS
HOMEOWNER RESPONSIBILITIES
CONTACTS
FOLLOWING CONSTRUCTION
COMPLAINT PROCESS
DURING CONSTRUCTION
BEFORE CONSTRUCTION
Prior to construction, you must sign the following
documents:
e Homeowner Assistance Program helps homeowners aected by Hurricane Harvey repair and rebuild their homes. e housing program
is administered by the GLO and provides homeowner assistance through:
You have 7 days to move out once the Pre -
Construction Conference is completed
• Maintain homeownership/residency for three years
• Maintain property taxes. Your property taxes
and insurance costs may increase following
the improvements.
• Maintain required insurance, including homeowner’s, ood (if applicable), and windstorm (if applicable).
• Telephone call to the GLO-CDR front desk line at 1-844-893-8937 OR
• Email GLO-CDR at cdr@recovery.texas.gov
• Written letters mailed directly to:
ATTN: GLO-CDR
Texas General Land Oce
P.O. Box 12873
Austin, TX 78711-2873
• You must sign o on all work to approve
builder payments
Your move out date is:
Your Builder is:
Your Applicant Coordinator is:
Telephone:
Telephone:
Texas General Land Office • recovery.texas.gov • 1.844.893.8937Texas General Land Office • recovery.texas.gov • 1.844.893.8937
• Pre-Construction Conference Report
and Notice to Proceed
• Construction Agreement
• Agreement to Participate
• Subrogation Agreement
• Promissory Note
• Notification Regarding
Independent Repairs
• Repairing and rehabilitating homes
• Reconstruction
• Improving a damaged home so that it is
resilient against natural disasters
• Elevating homes above flood level
REHABILITATION
RECONSTRUCTION
Repairs and restores your storm-damaged home to meet construction
codes and standards. Rehabilitation will be provided to homes that
have up to $65,000 in estimated repairs from the event. All other homes
will be reconstructed. Prior to the initiation of work on your home, the
GLO will provide a work write-up that details all items to be repaired.
We use standard construction materials and will utilize energy ecient
materials/appliances where applicable.
Demolishes and rebuilds your home on the same lot in relatively the
same size and manner. e GLO may also replace your existing
substandard manufactured housing unit (MHU) with a stick-
built home. e number of rooms for a home may be increased
or decreased based on your current household size. e GLO has
established standard oor plans for the Harvey HAP program. e
GLO has procured several builders and will assign all applicants as they
become eligible.
* All housing must meet all applicable local codes, rehabilitation
standards, ordinances, Green Building Standards, and zoning ordinances
at the time of project completion.